Short Lead Time for Silo Hat Production Line - Grain bin silo leg making machine – Thomas
Short Lead Time for Silo Hat Production Line - Grain bin silo leg making machine – Thomas Detail:
Silo Silo upright production line : Storage silo manufacturers know that punch accuracy and minimal flare are critical in Silo column , and so do we. That’s why we offer a variety of robust, accurate silo post line solutions to handle product ranging from different thickness. Mechanical and hydraulic pre and post-punch / cut designs mean we can provide a solution to nearly every stiffener manufacturing scenario. While options like rafting, inline splice production, and download capability maximize system utilization and profitability.
1.Drawing of the profile of the silo stiffener:
(Machine can be customized according to your needs, the following picture is the drawing provided by our customer, for reference only.)
2.Finished Product:
3.Working process of the production line:
Hydraulic decoiler –Shovel head device(Auxiliary feeding +Leveling) –Pre Cutting–Roll Forming Machine–Slitting & Waste Wire Collecting–Movable Pallet–Servo Movable Punching–Movable Pallet–CNC Bending–Hydraulic Cutting–Receive Table
4. Machine Pictures:
5. Machine Details :
Description | ||
Production name | Silo stiffener equipment | |
Machine floor area | About 25.5m*2m(L*W) | |
Feeding direction | left in, and right out | |
Voltage parameter | 380v,50Hz, 3 phase | |
Hydraulic oil | 46# hydraulic oil | |
Gear oil | 18# hyperbolic gear oil | |
Shaft diameter | 120mm | |
Shaft Material | 40Cr, quenching and tempering | |
Rack | Gantry type (Memorial archway type) | |
Rack material | Nodular cast iron | |
Punching die material | SKD11 | |
Rack quantity | 18 rows | |
Drive mode | Gear box drive | |
Working speed | about 1 piece/min | |
Transmission mode | Each rack with a gear distribution box drive | |
Forming roller | GCr15, quenching, the hardness of HRC56-62 º | |
Motor power | 45 KW *2 Siemens brand | |
Machine color | Machine base | As required |
Rack and gear box | As required |
6. After-sales service :
1) . User manuals / videos on installation, adjustment, setup and maintenance of the machine will be provided.
2). The machine is with Wi-Fi function, our technicians will help to work if the machine has a problem.
3). when the borders are open, we will send technicians to your factory for training. (The cost is paid by the seller.)
4). Warranty 2 years (Excluding man-made damage)
5). Delivery time: 90 working days.
6). Machine price: contact us.
7.About Us :
8.Transaction history :
Product detail pictures:
Related Product Guide:
It adheres on the tenet "Honest, industrious, enterprising, innovative" to develop new items frequently. It regards buyers, success as its very own success. Let us produce prosperous future hand in hand for Short Lead Time for Silo Hat Production Line - Grain bin silo leg making machine – Thomas , The product will supply to all over the world, such as: Mauritius, Luxemburg, Oman, Our tenet is "integrity first, quality best". Now we have confidence in providing you with excellent service and ideal merchandise. We sincerely hope we can establish win-win business cooperation with you in the future!
By Geraldine from luzern - 2017.08.18 11:04
We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
By Donna from Oslo - 2018.09.29 13:24